正确使用设备齐全的搅拌车可以促进施工并提高运营效率。正确使用机械零件会损坏设备并缩短其使用寿命。主要操作是严格按照说明进行操作。通常,如果夏天搅拌机轨道温度太高,则应立即停止搅拌并降低温度,然后再进行操作。
Proper use of fully equipped mixer truck can promote construction and improve operation efficiency. Proper use of mechanical parts will damage the equipment and shorten its service life. The main operation is to operate in strict accordance with the instructions. Generally, if the mixer track temperature is too high in summer, stop mixing immediately and reduce the temperature before operation.
1.在操作内置混合器时,液压系统的压力必须符合说明,并且不得随意调节。液压油的质量和数量必须符合原始要求。
1. When operating the built-in mixer, the pressure of the hydraulic system must comply with the instructions and shall not be adjusted at will. The quality and quantity of hydraulic oil must meet the original requirements.
2.在运行独立式混合器之前,请注意混合罐中剩余水和碎屑的填充和排放。在运输过程中,需要连续滚动以防止混凝土偏析。在混凝土搅拌车到达施工现场并卸下之前,搅拌机必须以14-18rpm的全速旋转1-2分钟,然后旋转并卸下。混合桶必须先停止然后打开,然后才能旋转。
2. Before running the stand-alone mixer, please pay attention to the filling and discharge of residual water and debris in the mixing tank. During transportation, continuous rolling is required to prevent concrete segregation. Before the concrete mixer arrives at the construction site and is unloaded, the mixer must rotate at full speed of 14-18 rpm for 1-2 minutes, and then rotate and unload. The mixing drum must be stopped and then opened before it can rotate.
3.环境温度不超过+25°C,从装卸到卸货的连续时间不超过60分钟,环境温度不低于+25°C,并且上述时间超过90分钟。不可以。
3. The ambient temperature shall not exceed + 25 ° C, the continuous time from loading and unloading to unloading shall not exceed 60 minutes, the ambient temperature shall not be lower than + 25 ° C, and the above time shall not exceed 90 minutes. may not.
4.在冬季施工期间,在开始工作之前,请确保冰已降落。下班后,小心地排干搅拌碗和供水系统中的剩余水,关闭泵的开关,并将控制手柄置于“停止”位置。
4. During winter construction, please ensure that the ice has fallen before starting work. After work, carefully drain the remaining water in the mixing bowl and water supply system, turn off the switch of the pump, and place the control handle in the "stop" position.
5.在施工现场卸货后,有必要使用设备上附带的软管冲洗料斗,卸料斗,卸料斜槽等,以去除附着在车身上的淤泥和混凝土。在返回搅拌站的途中,应将150-200升水倒入搅拌槽中,以清洁搅拌槽壁和叶片上的混凝土残渣。
5. After unloading at the construction site, it is necessary to flush the hopper, discharge hopper, discharge chute, etc. with the hose attached to the equipment to remove the sludge and concrete attached to the vehicle body. On the way back to the mixing plant, 150-200 liters of water shall be poured into the mixing tank to clean the concrete residue on the mixing tank wall and blades.
6.日常操作完成后,驱动程序将清水倒入自动向前混合器的混合桶中,以高速(14-18rpm)旋转5-10分钟,然后排干并清洁感光鼓的内部。确保用高压水清洁混合桶的所有部件时,应注意避免出现外观和操纵杆。增压水喷嘴与车身涂料外部之间的距离必须少为40厘米。
6. After daily operation, the driver will pour clean water into the mixing bucket of the automatic forward mixer, rotate at high speed (14-18rpm) for 5-10 minutes, then drain and clean the interior of the photosensitive drum. When ensuring that all parts of the mixing drum are cleaned with high-pressure water, care should be taken to avoid appearance and control levers. The distance between the booster water nozzle and the exterior of the body paint must be at least 40 cm.